Northern Hub Alliance
Contract Value
£7.4 million
Client
Skanska Bam Nuttall
Duration
12 months
Project
Scope
Ordsall Chord was a challenging and incredibly rewarding project for PL Infrastructure. Linking Manchester Piccadilly and Manchester Victoria stations for the first time, this iconic railway line has increased capacity in the region, while reducing journey times into and through the city.
It was a privilege to be part of the construction team. From an engineering perspective, the overall project was a huge undertaking, involving over 4,300 tonnes of welded and bolted steel, 14,300m3 of concrete, 3,575 tonnes of reinforcing steel, 28,500 tonnes of ballast and 500km of signaling, power and telecoms cable.
Industry accreditations
PL Infrastructure is committed to high industry standards and is accredited by: