pl-infrastructure-logo Castleton WwTW

Contract Value

£1.8 million

Client

C2V+

Duration

32 Weeks

Project

Scope

Castleton W.w.T.w. is an upgrade package to the existing UU site which sees the introduction of numerous new structures in the form of pre-cast concrete, traditional RC structures and a hybrid design which has both Pre-cast concrete and traditional RC combined.

Our activities on site have been varied, from traditional FRC works, to deep cofferdams and dewatering, all the while working to the strictest of safety briefs and to date having zero incidents on site.
All in all, the project has a tight programme with some key milestones outlined by the client for following trades. PL have achieved these to date with the project currently ahead of programme.